Thursday, July 10, 2014

Bathroom Remodel Progress: Day 2 & 3

Plumbing access panel installed in hall linen closet.  Unbelievable, but there was no access panel before.  There are also no shut-off valves for the shower, and those will be installed tomorrow.

hall linen closet before
(all shelves have been removed)

access panel frame
you can see through the shower to the opposite cinder block wall
the plumbing is in the foreground
the Fein Tool made quick work of all the precision cuts
no drywall repair to be done here

cover and frame temporarily on the floor
it will be all white and flush to the back wall after tomorrow

Drywall patching and mud work done.  The unexpected hole behind the toilet has been patched as well as the other holes and patches that were needed.

huh?  why a hole in the wall here?
only the previous owners know!

close up
water pipe looks fine

patch in process

mud work done
needs to be sanded before painting, though
Preparations made for recessing mirrored medicine cabinet.  Relocation of air pipe shaft and added new framing.  Drywall and mud work done.


boards and pipes in the way
see those two screws above the white pipe pieces?
they are coming through from the other bathroom
there's another mirrored cabinet on the opposite side of the wall
luckily, they only stick through about 3/4"
so we can work with that by building a frame around the cabinet on this side
to hide the fact that it won't be fully recessed

pipe work done
old frame cut away
new framing about to be added


ready for the new cabinet now
New light fixture base position determined and installed.

old wires from the "Hollywood Light" just sticking out of the wall


light base positioned and installed
mud work done
New shower base framed and installed. (We had a pre-formed shower pan and wall tiles there before)  The new shower stall will be tiled from floor to ceiling with mosaic tile on the stall floor, a listello part way up and niches for shampoo and soap, all tiled.



demo complete, shower pan gone
old drywall removed

new framing to support concrete base for tiling

new 3/4" plywood to support weight of concrete base

concrete poured, drain positioned

second layer concrete poured, rubber membrane in position,
chrome drain cover installed (but not yet cleaned)

another view

Additional shower framing done.

new framing added far right
to reinforce and support the glass doors

new framing added far left, again to support the
glass doors and bullnose edge of tiling

Cement board installed over the subfloor.

cement board, waiting in the hallway for its turn


cement board installed on floor, although with
all the contractors stuff in there it's hard to see
floor does not squeak anymore when you walk on it!

New exhaust fan installed.  This was a major pain as access was needed from the attic.  It's about 125 F in the attic right now! And of course there is a ton of stuff up there that needed to be moved around to get to the right spot.  Two plywood panels had to be removed (and then replaced afterward) as well as about 2 feet of blown-in insulation to get to the ducting for the bathroom fan.  It's a very nice, quiet fan and it actually moves the air around, unlike its predecessor.

hole where the old, noisy fan was
contractor rigged up a work light

ton of stuff removed from attic to make space to work up there
hallway, second bathroom and both son's bedrooms blocked
son #1 slept through all this!

new fan in place
it's so quiet!
NuTone Ultra Quiet 110 CFMs -- yeah!
very important since this bathroom has no window
and it's humid here 1/2 the year

Prep work for new valves and plumbing for the sink/vanity.

old sink plumbing

drywall cut away for access

cement board installed
new drain plumbing started
new valves tomorrow!
Just as the contractor got set up to use his saw yesterday, the weather turned sour and it started to drizzle.  So at first, he covered it with a trash bag.

But then decided to go get his canopy, and set that up instead.


And then, of course, the sun came out.  And stayed all day.

No comments: