I'm taking lots of pics, maybe too many, so I can remember what it all looks like in the various stages of disassembly and reassembly.
I removed the old tile a couple months ago so the shower has been torn apart for a while now. The contractor finished the demo of the rest of the bathroom this morning. That part took less than 3 hours. The custom vanity cabinet and plumbing fixtures were delivered today and are parked in the living room and hall on the mid-level for now. There are lots of holes in the walls of the bathroom.
Lots of holes.
Exploratory holes and unexpected holes! Ha!
That's the hallmark of a renovation project, isn't it?!? Some good news came out of it though. We won't have to replace the subfloor (YAY!) and it will be possible to relocate the drain shaft (the thing that extends up to the top of the house so that air is behind the water in the drain pipes, forcing the water to flow quickly to the sewer) so that the mirrored cabinet can be recessed. Two thumbs up. A recessed cabinet might not seem like a big deal; it wasn't recessed before. But, in this teeny tiny bathroom (it's 5' x 9') recessing the medicine cabinet will make a huge difference!
Lots of pics:
| I got up early and covered the bedroom up with drop cloths These projects are always so dusty/dirty |
![]() |
| bare shower stall |
![]() |
| tools and stuff |
![]() |
| exploratory hole behind medicine cabinet the pipe shaft thing can be seen to the far left |
![]() |
| unexpected hole behind the toilet previous owners must have had to make a repair to the pipe there's no evidence of water damage inside the wall |
![]() |
| where the ceiling fan used to be |
![]() |
| vanity used to be here |
![]() |
| new sink and vanity with drawers!! it's custom because of the small size space |
| pile of new tile for the shower and floor |
![]() |
| new glass shower doors um yeah, in the hallway it's only for a few days, right? |








No comments: